Productivity calculation
Most of the industrial engineers calculate worker/line efficiency on the basis of SAM value and actual productivity (per hour productivity of a operator/line). Below are the simple methods to calculate worker/line efficiency and productivity.
Worker/line efficiency
SAM (Standard allowed minutes) of the garment = 10
Minutes produced by each labor =(40 pieces X 10) = 400 minutes
Minutes Available = 10 Hrs x 60 Minutest = 600
Worker/line efficiency = (Minutes Produced / Minutes Available) = (400/600*100)% = 66.66
Productivity per worker
Total production in day per line =1600 pieces
Total manpower (operator +helpers+ others) = 40
Working time = 600 minutes (10 hours)
Productivity for 10 hours is =Total pieces produced/ manpower = (1600/40) Pieces =40 pieces.